In Atlanta in 1984, two new north-south surface sections of the subway were opened for service with a total length of 14.5 km, bringing the total length of the two lines in the city to 30.2 km.
U.S. Transportation Blog
In Atlanta in 1984, two new north-south surface sections of the subway were opened for service with a total length of 14.5 km, bringing the total length of the two lines in the city to 30.2 km.